A complex project, with logistical and political intricacies read on to find out how we managed to fully restore the external façade of Ursa Court with limited disruption to locals or residents.

The Housing Association was able to save £120K on access costs over 3 decorating cycles!

The Project

The Impossible Render Clean

Render Cleaning

  • Location:Brighton
  • Client:Brighton Housing Association 
  • Project Duration:28 Days
  • Subtrate:Silicone 
  • Access Method:Spectrum Steam

The Site

It was no wonder that many other contractors had deemed this an ‘impossible site’, a challenge that Spectrum was prepared to take on.

The Logistics

There were a lot of technical access challenges; However, there were also some political challenges too. The Bus station had rigorous protocols on health and safety, and if anyone were to gain access to the back of this bus station, they would need to undertake the same health and safety training their staff would have. The pub were not allowing any disruption to their garden especially during some of the busiest months of their year, gaining access to this would remain a challenge for Spectrum too.

With Spectrum considering all of the above. The method of cleaning would consist of combining two access strategies. 15% of the building would be cleaned via rope access in which an A-Frame portable anchor device would be brought to the site as there was no fixed anchor on the roof for the abseilers to use. The remaining 85% would be cleaned via the Spectrum Patented Render Cleaning System. This system would enable much of the work to be done from the safety of the ground without the use of any expensive and disruptive scaffolding, M.E.P.U. or specialist equipment. This access strategy alone was set to save the client over 30%! With an access method proposed, the political issues would need to be addressed for these planned works to be approved by all parties.

+plus point

The Housing Association saved £120K on access costs over 3 decorating cycles.

The Impossible Render Clean
Case Study

Spectrum Went Above And Beyond

To address the political challenges to this site, Spectrum conducted a tri-party meeting, to present a solution to the owners of the surrounding affected sites. Spectrum organised for their team to carry out the required health and safety training for them to gain access to the base of the bus and coach depot. The bus garage had also informed Spectrum that they had some roof and gutter issues. Spectrum carried out a full inspection for the bus garage as a thank-you for their cooperation to the planned works.

The pub were impressed by the fact that Spectrum would not need to use scaffolding around their pub to gain access to the block and as a gesture of goodwill for their collaboration on this project Spectrum had a credit note raised to them for future use which included a full external clean to their façade and windows.

+plus point
No Need For Scaffolding

Impossible, NEVER

Once all parties had confirmed they were happy to approve the cleaning works, Spectrum began restoring this building to its former glory. In just over 28 days, Spectrum had applied a biocidal wash, steam cleaned, and future-proofed each elevation with minimal disruption to all parties and the public. In addition to the render restoration, Spectrum had cleaned the stained decking, taken care of the gutters and cleaned all windows and surrounds. A building that had been deemed “impossible” to access and “impossible” to clean had been transformed with no risk to the public or environment.

Back to Case Studies

Read Our Specialist Cleaning Case Studies

Multi-Coloured Cladding

28th July 2020

+plus point5 Different Types of Cladding restored to its former glory

Roof Leak Detection

17th December 2020

+plus pointThrough our removable anchor points, we are able to eliminate the need for scaffolding, offering up to £30,000 in savings to our clients!

When 3 Companies Couldn't Find An Access Solution We Knew We Had To Solve It!

18th June 2020

+plus pointOur patented cleaning equipment made this possible.

How We Cleaned 100 Rendered Elevations In Just Two Months!

18th June 2020

+plus pointWe saved our client thousands of pounds in access costs.

Window Cleaning and Coronavirus Cleaning for our Client in Hackney

18th June 2020

+plus pointOur experience in access made it possible to carry out this work.

Clean Your Listed Building Instead of Painting!

25th September 2020

+plus pointCleaning listed buildings regularly prolongs the time in between painting cycles!

Rope Access Stone Repairs

4th February 2021

+plus pointOur team of highly credible stone restorers were able to find the exact colour match for the stone by sending it to the lab.

Rope Access Render Cleaning In Clapham 600 Man Hours And A Clean Facade Later!

18th June 2020

+plus point20% cleaned with custom 3D printed cleaning equipment.

London's Best Graffiti Removers Show Off Their Skills!

15th August 2020

+plus pointAll graffiti removed easily and without a trace!

No Scaffolding Rooftop Leak Detection

12th November 2020

+plus pointEliminating the need for scaffolding, utilising abseiling significantly reduces access costs for our clients!

Can We Help With Your Specialist Cleaning Needs?