This project saved our client £70,000 on scaffolding and painting over 2 decorating cycles
Spectrum was approached by an existing client to restore the exterior of Radford House, one of the properties managed by the client. The work was to include cleaning the external render of the building as well as some woodwork and metal cladding.
One of the main issues was that the building’s York/cream render was heavily contaminated by algae growth. It was also disc, I’m building my network with surveyors and construction professionals raising awareness about modern render technology. In fact, the discolouration and staining was so bad the client didn’t think the building could be cleaned at all, and certainly not restored to its former glory.
The timescale for the project was four to six weeks. During this period, the render was to be cleaned using our patented four-stage process. This would remove the algae and rust stains from the exterior, leaving Radford House looking rejuvenated and refreshed.
During the project, some works had to be scheduled for weekends in order to minimise disruption to the onsite commercial units. Working out of hours also allowed us easier access to all areas of the building.
Radford House sits on a steep slope. This makes it difficult to reach some parts of the building and limits access for cherry pickers. The site is also located on a busy high street, full of pedestrians and commercial units. When accessing Radford House, and planning the schedule of works on the building, we also had to take this heavy footfall into account.
As well as a steep slope and a busy high street to consider, we had to work around the requirements of the taxi office attached to Radford House when accessing the site. This meant planning some works for weekends and after hours and using canopies to protect commercial access.
As the steep slope Radford House sits on made it difficult for cherry pickers to access the site, it required rope operatives to clean the render, cladding and wooden elements of the building. Using operatives on ropes, rather than heavy machinery, also helped to minimise disruption to the high street and taxi office.
Our cleaning plan included using IPAF certified operatives for some small sections that were completed via MEWP. Where some balcony and ledge work was carried out, we used IRATA trained operatives to ensure the most robust and safest access strategy was in place.
As well as a prohibitively steep slope, access to the Radford House site was complicated by the narrow pathways surrounding the building. This meant it was almost impossible to erect scaffolding and, if it weren’t’ for our patented render cleaning system, the project would not have been possible.
While we were cleaning the outside of Radford House, we used building canopies to protect the entrances of commercial units located in the building. This allowed them to continue to operate throughout the cleaning process.
Throughout the project at Radford House, we used our patented render cleaning system. This uses a biocide treatment, together with a superheated steam delivery, to kill algae, remove stains and leave render looking like new.
This unique system allows us to clean and rejuvenate render quickly and effectively, without the need for scaffolding and heavy machinery. Once the staining and algae have been removed, we cover the surface in a thin layer of biocide to prevent the algae growing back straight away.
Before the project began, we carried out a full site survey on the property. By thoroughly surveying Radford House, we were able to completely assess the site and come up with a plan that was both affordable and cost effective. Surveying the site also gave us the opportunity to take a closer look at the render of the building and decide which cleaning processes would produce the best results.
The results of the Radford House project were incredibly positive. For the client, one of the main benefits of using our service was cost. Our patented cleaning technique allowed us to rejuvenate the property at a fraction of the price of conventional cleaning.
For example, if the client had paid for scaffolding to be erected and the building to be painted, the project would have cost an extra £35,000 + VAT to complete. This means that, over two decorating cycles, our services have saved the client an impressive £70,000.
Another great result of the project was the complete transformation of the building. Removing algae and rust stains, and cleaning external wood and cladding, has helped to restore Radford House to its former glory.
The additional work we carried out on the property has further enhanced its aesthetic. Our bird proofing measures will help to prevent staining and mess, while cleaning the building’s gutters and drains will help to ensure Radford House stays in good condition inside and out.
While working on Radford House, we also cleaned the windows and window frames of the building. This was included in the cost of the project, as was the jet paving work that was carried out at the end of the clean.
Throughout the project, disruption to those using Radford House, and nearby businesses was kept to a minimum. Neighbouring commercial properties were also happy with the work carried out as we cleaned some of their areas as a gesture of good will and a thank you for their co-operation on the project.
"We are very impressed with your method of cleaning render.”
-Senior Property Manager at Radford House
“It feels great to make such a big difference, to a building that needed a complete transformation as much as this one, we’ve never seen so many residents give so much positive feedback.”
-Project Lead Operative Julian
20th October 2020
4th March 2021
17th December 2020
18th January 2021
18th June 2020
11th June 2020
4th February 2021
18th June 2020
22nd January 2021
27th July 2021
Spectrum transforms buildings over the whole of the UK. Call our London based office and we will be happy to discuss your requirements and will be able to provide access to our Spectrum teams and help deliver a plan for your requirements.