Social Value:Our Turn to Build: External Cleaning and Repairs at the BRIT School
A £40,000 programme of specialist building care, giving back to the school that helped shape Spectrum’s story.
- Location
- Croydon
- Project Duration
- 2 Weeks
- Substrate
- Render, Metal
- Access Method
- MEWP, Scaffolding
- Patents Used
- Pole System
- Complexity Level
- 6/10
The BRIT School has an especially important place in Spectrum’s story.
Spectrum founder Lucian Ivan attended the school intending to pursue a career in performance. While studying at university, he began running a small cleaning round to earn money. As demand grew, that work developed into Spectrum Specialist Support, providing specialist cleaning, repair and building maintenance services across London, the South-East and wider UK.
For Lucian, the support and confidence he gained at the BRIT School played an important part in what came next.
“The school is an inspiration to me, and I would not have had the confidence or support to start my own business when I finished if it wasn’t for the BRIT School.”
Lucian has always felt that when a person or organisation has helped you reach where you are, there is value in giving something back when you are able. With the school needing to make its resources stretch further, he saw an opportunity to contribute in the most practical way Spectrum could: by using the company’s own people, skills and equipment to care for the school’s buildings.
During the summer holidays, Spectrum donated £40,000 of external cleaning, roof repair and associated maintenance work to the BRIT School.
The programme brought together several of our specialist services across the school’s main building and annex, from DOFF steam cleaning and graffiti removal to flashing and render repairs, snowguard installation and remedial works to external metal window grilles.
We called the project “Our Turn to Build”, a reflection both of the physical work done at the school and of Lucian’s belief that former students can use the skills, resources and opportunities they have gained to support those following in their footsteps.
The Project
The project involved a varied programme of external building care across the BRIT School’s main building and annex.
Rather than addressing one isolated maintenance issue, the works brought together external cleaning, repairs and safety-related maintenance in one coordinated programme.
Our scope included:
- DOFF steam cleaning sections of the façade
- Graffiti removal
- Replacement of defective flashing on flat-roof areas
- Repairs to damaged render
- Snowguard installation
- Remedial works to external metal window grilles
The programme was completed during the school’s summer holidays in mid-August and had a total value of £40,000, which Spectrum donated in full.
The work therefore had two goals.
The first was practical: to address visible deterioration, defective building elements and potential safety concerns across the exterior.
The second was to help the school protect more of its limited budget for the students, teaching, technology, events and opportunities at the heart of the BRIT School experience.
The Challenges
One of the main considerations on this project was the variety of work required.
External building maintenance is rarely limited to one surface, one elevation or one trade. A property can simultaneously have areas requiring cleaning, weatherproofing repairs, damaged finishes and external components that need remedial attention.
At the BRIT School, our team needed to move between façade cleaning, roof-level repairs, render work and maintenance to external metal elements across different parts of the main building and annex.
Access therefore had to be considered alongside the maintenance itself.
Some areas could be reached using Spectrum’s in-house mobile access equipment, while other locations were more suited to specialist rope access. Rather than relying on one method for the whole site, we used a hybrid access approach, selecting the most suitable access method for each part of the project.
This flexibility is particularly important on buildings where several maintenance services are being done at the same time. Instead of making the work fit one predetermined access system, we can adapt the access strategy to the location and work required.
The programme was also carried out during the summer holidays, giving the team a defined period in which to coordinate the different cleaning and repair works across the school.
The Solution
Spectrum developed a multi-service maintenance programme that allowed us to address each area while considering the school exterior as a whole.
For sections requiring façade cleaning, we used the DOFF steam cleaning system.
DOFF cleaning uses high-temperature, low-pressure steam to remove staining and organic build-up while minimising the risk of damage to the underlying surface. Rather than relying on aggressive pressure, the heat does much of the cleaning work, making it a useful method where effective cleaning is just as important as protecting a delicate facade.
Graffiti removal was also included in the programme, helping restore affected sections of the exterior.
Alongside the cleaning works, our team addressed several defective building elements.
Defective flashing was replaced on flat-roof areas, damaged sections of render were repaired and snow guards were installed. We also completed remedial works to external metal window grilles, securing these elements as part of the wider maintenance programme.
Bringing these different services together allowed Spectrum to provide a full spectrum of repairs rather than approaching every requirement as a separate project.
The Process
The works were delivered as a coordinated programme of cleaning, access and repairs across the school’s main building and annex.
Hybrid Access
Different areas of the school presented different access requirements, so our team combined in-house mobile access equipment with specialist rope-access techniques.
This allowed us to select an appropriate method for each work area rather than depending on one access solution across the whole building.
For facilities managers and property teams, this type of hybrid access can be particularly useful where maintenance requirements are spread across roof areas, façades and other difficult-to-reach external elements.
DOFF Steam Cleaning
Sections of the façade were cleaned using the Stone Health DOFF Integra system.
DOFF uses superheated steam at low pressure to loosen and remove staining and organic matter. By using heat rather than aggressive water pressure, the system can provide an effective clean while reducing the risk of unnecessary damage to the substrate.
The cleaning element formed part of the wider approach to restoring and caring for the school’s exterior.
Graffiti Removal
Graffiti removal was carried out alongside the façade cleaning.
Removing unwanted markings helped improve the condition and appearance of the affected areas and complemented the wider programme of external maintenance.
Flashing Repairs
Our team replaced defective flashing on areas of the school’s flat roofs.
Flashing plays an important role in weatherproofing roof junctions and details, helping to direct water away from vulnerable areas of the building envelope. Addressing defective flashing therefore formed an important part of the roof repair element of the project.
Render Repairs
Damaged sections of external render were also repaired.
Repairing isolated areas of deterioration as part of a wider maintenance programme helps ensure that defects discovered across a building are not overlooked simply because another service, such as cleaning or roof repairs, is taking place at the same time.
Snowguard Installation
Snow guards were installed as part of the programme’s safety-related maintenance works.
This element sat alongside the repair and cleaning services, demonstrating the range of requirements that can often be brought together within one external maintenance project.
External Metal Grille Remedials
Finally, Spectrum carried out remedial work to external metal window grilles.
These elements were secured as part of the wider programme, helping ensure that the project addressed not only the visual condition of the exterior but defective external components as well.
The Result
The completed programme brought together specialist façade cleaning, targeted building repairs and safety-related maintenance across the BRIT School’s exterior.
Sections of the façade received DOFF steam cleaning and graffiti removal, damaged render was repaired, defective flashing on flat-roof areas was replaced, snow guards were installed and external metal window grilles received remedial attention.
Using hybrid access allowed our team to move between these different areas using a combination of in-house mobile equipment and specialist rope-access techniques, adapting the approach to suit the requirements of each part of the school.
Most importantly, the entire £40,000 programme was completed free of charge.
By taking care of essential maintenance the school would otherwise have needed to fund, Spectrum’s contribution helped protect more of the BRIT School’s resources for the students, teaching, technology, events and opportunities it provides.
For Lucian, that is ultimately what the project was about.
“When you are first setting out, whether that is in music, acting, technology, business or something completely different, you need a start. Those first few steps and the people who support you through them can change the whole direction of your life.”
Protecting the school’s buildings is also about protecting the environment in which those first steps can happen.
The teachers, technology, events and opportunities Lucian remembers were part of what gave students the confidence to develop their own ambitions. By using Spectrum’s own expertise to take care of essential building maintenance, he wanted to help the school continue providing that same kind of experience for the students who come next.
There is another part of the BRIT School experience that Lucian remembers just as strongly, togetherness.
Students pursuing very different careers supported one another while sharing the same school, resources and opportunities. Leaving the BRIT School did not erase that shared experience, and Lucian hopes “Our Turn to Build” can encourage former students to reconnect with it by supporting the school in whatever way is realistic for them.
The entire £40,000 programme was completed free of charge.
Giving back does not have to mean £40,000.
It could be time, mentoring, professional expertise, useful contacts or a smaller financial contribution. One contribution on its own may only go so far. What becomes significant is what can happen when many people choose to give something back together.
For Spectrum, our contribution was the thing we know best: building care.
What started as a small cleaning round while Lucian was at university eventually developed into a specialist building maintenance company capable of returning to care for the school that helped give him his own start.
Now, it is our turn to help build what comes next.
Your Building Deserves Thoughtful, Expert Care
Ensure your building remains in top condition with Spectrum Specialist Support. Our expert team offers a full range of exterior maintenance services, from external cleaning and repairs to comprehensive restoration of brick, render, stone and other substrates.
With an IRATA-certified team of abseilers and experience across hundreds of varied projects, we’ll find an access solution that saves you time and money, even on the most complex elevations.
Whether you need emergency maintenance or a tailored service plan, we are here to help. Contact us directly on 020 3551 6206 or email us at info@spectrumss.co.uk to discuss your requirements and receive a free consultation and quote.